Process Flow

Execution process from inquiry to stable shipment

We split each order into measurable stages with clear checkpoints, responsible teams, and documented results.

  • Assigned manager from first request to dispatch
  • Production and stock routes selected by project priority
  • Quality and documents synchronized with shipment date
18,000+

Tons shipped per year

420+

Active B2B clients

37

Supply countries

12+

Years of expertise

How We Work

Step-by-step project execution

Each stage has fixed control points and timing. This keeps delivery predictable for serial and project lots.

01

Specification analysis

We review the task, operating conditions, and required standards.

02

Lot preparation

We cut, mark, assemble, and perform final quality checks.

03

Documentation

Certificates and shipping documents are prepared for your project.

04

Shipment

Products are delivered in line with your production schedule.

Quality Control

Three-level quality assurance

Incoming, in-process, and final inspections minimize technical risk before shipment.

Incoming inspection

Verification of raw material and certificates before lot launch.

  • Heat and steel grade verification
  • Document consistency check
  • Visual condition check

In-process control

Dimension and marking control during cutting, assembly, and sorting.

  • Geometry tolerance control
  • Wall thickness random checks
  • Lot traceability by marking

Final acceptance

Final lot validation before packaging and dispatch.

  • Final size and quantity check
  • Photo fixation and packing list
  • Release with shipment documents

Documentation & Logistics

Complete document package and shipment transparency

We prepare technical and logistics documents in parallel with lot production.

Quality documents

MTC, certificates, and conformity records for each shipment lot.

Commercial documents

Specification, invoice set, and shipment details aligned with contract terms.

Packing control

Marking map, lot labels, and packing list to simplify receiving.

Delivery tracking

Status updates from loading to destination arrival.

Typical lead-time map

Specification approval 1-2 days

Final dimensions, grade, and standards are fixed.

Lot preparation 2-7 days

Cutting, sorting, and quality checks according to complexity.

Documentation package 1 day

Certificates and shipment documents prepared before dispatch.

Shipment 1-5 days

Delivery timing depends on route and consignee schedule.

Need exact schedule?

Send specs and receive a detailed commercial offer

We will return with timing, technical notes, and pricing for your lot.

Request Quote